Full strip out of the existing build up back to original concrete deck
New rainwater outlets installed and sumps formed
VCL, 130mm insulation and carrier membrane installed
Polyroof Protec system applied in chromite grey
20 year guarantee included from Polyroof
We also removed 2 courses of slates from the valley sides, installed a new timber layboard with VCL, new vents and eaves guards, and tiled back with new where previously removed.